Is Wirral ready for a no-deal Brexit?
A report by Sky News[1] has highlighted concerns in many local authorities about the impact of a "no-deal Brexit" on their ability to provide a range of local services.
Cllr Andy Swain
Ward: Teign Valley
Parishes: Ashton ; Bridford ; Christow ; Doddiscombsleigh ; Dunsford ; Hennock ; Tedburn St Mary ; Trusham
Mobile: 07756 253908
Email: andrew.swain@teignbridge.gov.uk
A report by Sky News[1] has highlighted concerns in many local authorities about the impact of a "no-deal Brexit" on their ability to provide a range of local services.
South Lakes MP Tim Farron has started a petition callin g for the UK to have a world class radiotherapy service accessible for all cancer patients.
We are planning to distribute within this area a cross-party leaflet made up of short contributions from local people, outlining why the EU matters to them personally. The leaflet will be printed and distributed by the Newark and Sherwood Liberal Democrats but will not carry any other Lib Dem party branding as we want to encourage people from all political parties, or none, to have their say.
We are planning to distribute within this area a cross-party leaflet made up of short contributions from local people, outlining why the EU matters to them personally. The leaflet will be printed and distributed by the Newark and Sherwood Liberal Democrats but will not carry any other Lib Dem party branding as we want to encourage people from all political parties, or none, to have their say.
As the first tram-train project in the UK the constuction of the Rotherham to Sheffield Line was never going to be a particularly easy.It was designed to run partly on the type of rails used on the Sheffield SuperTram System and partly on existing Network Rail "heavy rail" track. There were various interactions to be considered apart from the rails, such as power systems, signalling, communications and control equipment.
As the first tram-train project in the UK the constuction of the Rotherham to Sheffield Line was never going to be a particularly easy.It was designed to run partly on the type of rails used on the Sheffield SuperTram System and partly on existing Network Rail "heavy rail" track. There were various interactions to be considered apart from the rails, such as power systems, signalling, communications and control equipment.